Throughout the week 10, Monday the 8th of March and Friday the 12th of March, I have been developing the scenographical set at the wood workshop and preparing a schedule for the Performance – Lecture I was about to present on the 25th of March. I did encounter several problems while deciding how should the tv-set structure be constructed. The final decision was influenced by the costs and the time. With the sketch changed and a reasonable lower price, I could start the process of building the structure within a short period of time.